・On-site inspection
➡Full property inspection (walls, ceilings, plumbing, electrical and etc).
➡Measured all rooms
※after signed up the contract, construction begun.
・Demolition
・Preparation
・Electrical work
・Gate ane miscellaneous works
・Installation, connection, finalizing
・Kitchen installation
・Installtion for mail box
・Installation for distribution board
・Final check after construction